← Back to Homepage

Q1 2026 Board Update

This page summarizes operational, financial, and project information drawn from the March 15, 2026 board meeting materials, the approved January 18, 2026 minutes, and the first-quarter 2026 newsletter draft.

66.3%

Year-over-year reduction in operating expenses compared with Q1 2025.

34.1%

Q1 budget utilization as of March 15, 2026, despite unplanned wall-repair preconstruction costs.

87%

Reported collection rate, with legal collection expense still minimal.

16

Homes currently classified as delinquent, representing 11.0% of the community.

Financial Performance

The first-quarter 2026 budget was reported as operating at 66% lower than Q1 2025 as of March 15, 2026. The board financials emphasize that even with some unexpected perimeter-wall pre-construction costs already charged, spending remains majorly below budget.

Bar graph comparing 2025 and 2026 Surrey Ridge expense categories
Expense comparison graphic supporting the Q1 2026 financial-performance summary.

Perimeter Wall Repair Update

The March 15 board meeting detailed a much more advanced wall-repair status than previously outlined. The palm tree and root ball adjacent to the affected wall section have already been removed, and the association has moved past boundary survey with elevation and engineering plans for repair that have been submitted to Orange County permitting for approval.

Engineering wall repair section detail drawing
Engineering section detail supporting the perimeter wall repair scope and permit package.

Pool Operations and Cost Control

The board is using active software-assisted monitoring, temperature and weather forecasting, auto-calculating chemical-balancing prescription, and disciplined runtime and chemical cost tracking using software written by Scott Davis designed to reduce costs and increase safety and bather comfort.

Community Improvements

The Q1 island and cabana updates have continued emphasis on visible, budget-conscious community upgrades.

Cabana planter and revitalization planning photo
Cabana planter and revitalization planning image supporting the Q1 community-improvements update.

Volunteer Opportunity: 2027 Nominating Committee

The board is calling for volunteers that would be interested in being part of the Nomination Committee tasked with nominating candidates for next year's board member election.

This page summarizes current board materials, financial performance, project status, and homeowner updates for the Surrey Ridge community.